Availability: | |
---|---|
Quantity: | |
single girder crane
Henan KuangShan
S—Crane span
H—The distance from the crane travel rail top to the crane highest point.
h—The distance to the crane travel rail top when the hook moves to the top point.
A—The distance from the crane rail center to the end girder outside.
W—Crane end girder wheel distance.
B—The length of the crane end girder including the buffer.
Notes:
1. The standard travelling speed of crane is 3-30m/min (frequency conversion)
The standard travelling speed of trolley is 2-20m/min (frequency conversion)
2. There are many optional speed levels and frequency control lifting except the standard speed.
3. Control methods: ground control, remote control and the combination control of the two.
4. The data listed in the form is only for reference. Please forgive the non-informing if the date changed.
5. Please contact us for more details and special requirements.
S—Crane span
H—The distance from the crane travel rail top to the crane highest point.
h—The distance to the crane travel rail top when the hook moves to the top point.
A—The distance from the crane rail center to the end girder outside.
W—Crane end girder wheel distance.
B—The length of the crane end girder including the buffer.
Notes:
1. The standard travelling speed of crane is 3-30m/min (frequency conversion)
The standard travelling speed of trolley is 2-20m/min (frequency conversion)
2. There are many optional speed levels and frequency control lifting except the standard speed.
3. Control methods: ground control, remote control and the combination control of the two.
4. The data listed in the form is only for reference. Please forgive the non-informing if the date changed.
5. Please contact us for more details and special requirements.
Home | Products | About Us | News | Contact Us