Baosteel’s A-inspection Was Affirmed Again, And It Strives To Sprint into The Fourth Quarter

Publish Time: 2023-10-30     Origin: Site

Baosteel A-inspection successfully accepted

From October 18th to 20th, during the fourth quarter of the decisive battle in Henan Mine, the crane products manufactured by the company for the Baosteel project successfully passed the A inspection of the Baosteel expert group.

Baosteel A inspection

The Baosteel project expert team inspected the crane's self-inspection records, material reports, flaw detection reports, accessory kit certificates and other information. According to the contents of the A inspection outline, the crane's trolley structure, bridge structure, and large and small trolley assembly were measured; the hoisting, trolley and trolley operating mechanisms, and electrical systems were powered on and tested, and the appearance of the crane was inspected.

Double girder overhead crane

After strict A-inspection, the expert group unanimously believed that the crane has domestic advanced, mature and reliable technology, the product quality is excellent, and various energy consumption indicators have reached the domestic advanced level. The production and manufacturing strength of Henan Mine was once again highly affirmed. Henan mine  crane products successfully passed Baosteel's acceptance inspection.


Baosteel experts took photos with mine employees


Contact Us

600t "Mineral Source" Intelligent Manufacturing | Supporting The Construction of China's Maritime Power

Empowering National Energy Development | Henan Mine Supports Xinjiang Combined Heat And Power Project

Intelligent Manufacturing of 'Mineral Resources', Setting Sail on A Long Voyage | Crane for Batch Export of Henan Mines To Vietnam Project

Walking on The Same Path, Working Together for Mutual Benefit | Company Party Secretary Cui Peijun Visited Youfa Group for Inspection And Exchange

The Quality Month Oath Ceremony of Henan Mine in 2026 Was Grandly Held